The timeline and budget of a renovation depend on decisions made before work starts. Here is what to settle first.
A renovation succeeds or fails on decisions made before work begins. Time spent planning saves both money and stress later.
1. Define the goal
A cosmetic refresh or a full replacement of utilities? That question drives most of the estimate.
2. Measurements and a plan
Exact room sizes, electrical points and plumbing positions belong on the plan. Moving them later is the most expensive change.
3. Choose materials in advance
If tiles, flooring and doors are chosen as the job goes, the crew ends up waiting.
4. Ask for an itemised estimate
Not one total, but separate lines for labour and materials. It makes comparing and tracking far easier.
5. Inspect in stages
Concealed work (wiring, water lines, waterproofing) should be checked before it is covered up.